From early assessment to long-term operation, we take responsibility beyond equipment supply.
SEACPL leads the engineering and remains your single point of responsibility.
Most plants don’t need a new vendor. They need a second technical view before:
We’re not here to replace your vendor. We’re here to prevent decisions you’ll regret in Year 3.
They usually begin as:
Most plants don’t need bigger equipment.
They need clearer engineering thinking.
Engineering-led design and optimisation of steam generation, distribution, and recovery beyond boiler selection.
System-level compressed air solutions focused on pressure stability, leakage control, and power efficiency.
Real-world observations from operating plants on where efficiency, reliability, and compliance quietly drift.
Fuel cost rising 8–12% YoY despite no production increase.
Root cause: blowdown practices, excess air drift, untracked flash losses.
Outcome: 11% reduction in fuel cost per ton of steam within 90 days.
Steam pressure instability during peak loads.
Root cause: undersized headers, poor load distribution, reactive controls.
Outcome: Stable pressure across load range, zero production complaints.
Three compressors running, high power bills, shop-floor complaints.
Root cause: leakage, pressure escalation, poor sequencing logic.
Outcome: Reduced to two machines, 18% power saving, complaints eliminated.
These outcomes don’t come from equipment upgrades alone. They come from correcting assumptions before spending money.
Engineering judgment matters most when decisions last 15–20 years.
SEACPL is led by Jaydip Gandhi, a business leader and engineer with over 32 years of experience across industrial utilities, steam systems, energy management, and OEM-led execution.
Having worked across both OEM environments and operating plants, his focus today is helping leadership teams make technically defensible, long-term utility decisions.
SEACPL serves as the execution arm for engineered outcomes.
Fill all information details to consult with us to get sevices from us
Why 92% boiler efficiency often means ~82% in reality
The hidden steam loss triangle
15-Point Steam Health Self-Audit Checklist
A short review costs nothing. Getting it wrong costs for years.
Complimentary review (typically part of a ₹10,000+ diagnostic exercise)